Hydro-Mechanical Works for a Hydropower Project

The complete hydro-mechanical package, from intake to penstock, for a hydropower project in Northern Pakistan.

For a hydropower project in Northern Pakistan, Cadneed designed the hydro-mechanical package from intake to penstock. The work covered settling basin inlet, outlet and flushing gates with their embedded groove frames, bottom intake trash racks, a bell mouth intake, a penstock expansion joint, a symmetric wye bifurcation, and steel protection sheds for the basin and hoist. Every item was modeled in 3D and detailed for local fabrication.

Models

Components

3D exploded model of a sleeve-type penstock expansion joint with gland packing rings

Penstock Expansion Joint (Sleeve Type)

Sleeve-type penstock expansion joint with gland packing, delivered as a 7-sheet fabrication set.

3D model of a steel bell mouth intake for a hydropower penstock

Hydropower Bell Mouth Intake

Three-segment bell mouth intake with stiffening ribs and flanges.

Settling basin inlet, outlet and flushing gates with their embedded groove frames, 3D models by Cadneed

Settling Basin Inlet, Outlet & Flushing Gates

Vertical lift slide gates with embedded groove frames for a hydropower settling basin.

3D model of a bottom intake trash rack panel with steel bar screen

Hydropower Trash Racks

Bottom (Tyrolean) intake trash rack, embedded grooves and an inclined intake trash rack.

3D model of a symmetric wye bifurcation for a hydropower penstock

Penstock Wye Bifurcation (Symmetric Y)

Symmetric Y-branch that splits the penstock flow to two units.

← Back to Portfolio

Have a similar project?

Send us your sketch, datasheet or old drawing and we’ll reply with a plan and a clear quote.